2026 Climate Data: Why VRF Cooling Loads Should Be Rechecked

Current WMO data shows why design temperatures, partial-load efficiency and VRF capacity selections should be reviewed with up-to-date project inputs.

What does this mean for a VRF project?

The data should not be used as a stand-alone equipment selection rule. Building use, local design conditions, envelope performance, ventilation demand and operating hours must be evaluated together.

Recommended engineering approach

A reliable VRF design starts with a current load calculation and continues with manufacturer selection software, piping checks, diversity analysis and part-load performance verification.

  • Use current outdoor design conditions and realistic occupancy profiles.
  • Avoid both undersizing and unnecessary oversizing.
  • Evaluate ventilation and heat recovery together with space conditioning.
  • Check refrigerant type, total charge and long-term service strategy.
  • Include metering, central control, alarms and commissioning records.

Conclusion

Each building requires a project-specific assessment. Contact the Global VRF engineering team for system comparison, capacity selection and a tailored quotation. Contact our engineering team.